Process Manager

Chez Groupe Atlantic

De février 2012 à décembre 2014
Main mission : to build the process department of a plant producing electrical convectors & water-heaters : - Recruited 4 local engineers for all process areas (stamping, welding, painting and enamelling workshops) - Organized tasks to improve daily process performance (defect percentage, OEE) and ...
Lire la suite
 

International Support Process Engineer

Chez Groupe Atlantic

De janvier 2011 à janvier 2012
Provided support on stamping and painting processes, to start a new electrical convector plant in Ukraine : - Started and put under control a whole painting line (surface treatment tunnel, tribo-powdering painting cabin & furnace) - Assisted stamping workshop about quality issues - Ran tests to set ...
Lire la suite
 

Ingénieur Process Tôlerie

Chez Thermor Pacific (groupe ATLANTIC)

De août 2009 à janvier 2011
In charge with stamping processes in an electrical radiators factory : - Daily management of solving internal quality issues, based on QRQC - Reduced scraps from 20% to 1% on a bending press to save 50k€ / year - Set up control charts on cutting lines - Represented production in project teams for ...
Lire la suite
 

ME Stamping Trainee

Chez Faurecia Automotive Seating

De septembre 2008 à février 2009
Planning of the increase of the OEE (Overall Equipment Effectiveness) of a new 4-stamping-press line : - Measured losses of OEE. - Planned and followed correctives actions. Creation of range & rules for tool-adjustments : - Defined DoE. - Planned their execution, measures. - Made their analysis. - ...
Lire la suite
 

Université Compiègne, Compiegne

Génie des Systèmes Mécaniques - Production Intégrée et Logistique, Génie des Systèmes Mécaniques

De 2005 à 2009
 

ME Grinding Trainee

Chez SKF

De septembre 2006 à février 2007
Improving the cycle-time of a bore-grinding machine : - Made a statistical analysis of incoming-quality. - Created a statistical method for the calculation of cycle-positions. - Lead tests on production line to validate a potential decrease of the cycle-time of 10% (actually limited by tool ...
Lire la suite
 

Production & Work organization trainee

Chez Renault

De avril 2005 à août 2005
Supporting the implementation of the SPR ("Système de Production Renault", inspired by the Nissan Production Way) in a stamping workshop, for its standardization axis : - Observed operators' practices for different tasks. - Compared them and defined the best ones in terms of Quality, Cycle-time, ...